Jul 2022 – 6 Kingsdown Parade House, progress on Site.
Timber floor is shaping up! House frame will be up in no time.
Jul 2022 – 6 Kingsdown Parade House, progress on Site.
Timber floor is shaping up! House frame will be up in no time.
Jun 2022 – 6 Kingsdown Parade House, progress on Site.
Blockwork supporting the timber floor is going up.
May 2022 – 6 Kingsdown Parade House, progress on Site.
Concrete raft is being poured to receive a raised timber frame structure with ground floor matching the street pavement level on this sloping site.
Photo by Dovetail Construction
Mar 2022 – 6 Kingsdown Parade House, progress on Site.
After the careful demolition of the existing house, an old, vaulted cellar is being retained on site. The ground levels are now being reduced for the foundation.
Feb 2022 – 6 Kingsdown Parade House, progress on Site.
Demolition starts on No.6 Kingsdown Parade site. An old, dilapidated house will be replaced with a new highly insulated and sustainable family home.
Oct 2021 – Waterlilies, progress on Site.
Garden deck going in on top of the old reservoir. The car park is below the new communal garden to ensure the site is as green and open as possible.
Sept 2021 – Waterlilies, progress on Site.
Roof terraces are taking shape.
Jun 2021 – Waterlilies, progress on Site.
The lower terrace timber frame construction is progressing. Render finish being applied to upper terrace
Jan 2021 – Waterlilies, progress on Site.
The upper terrace is taking shape – good work by Dove Construction in these difficult winter conditions (not to mention Covid/global supply shortage/Brexit!)
Also, Bright Green Futures (the clients) are putting together videos about the project, follow this link: https://www.brightgreenfutures.co.uk/projects/water-lilies/
Dec 2020 – 5 Kingsdown Parade.
Planning approval granted for five dwellings – just in time for Christmas!