Jun 2021 – Waterlilies, progress on Site.
The lower terrace timber frame construction is progressing. Render finish being applied to upper terrace
Jun 2021 – Waterlilies, progress on Site.
The lower terrace timber frame construction is progressing. Render finish being applied to upper terrace