May 2022 – 6 Kingsdown Parade House, progress on Site.
Concrete raft is being poured to receive a raised timber frame structure with ground floor matching the street pavement level on this sloping site.
Photo by Dovetail Construction
May 2022 – 6 Kingsdown Parade House, progress on Site.
Concrete raft is being poured to receive a raised timber frame structure with ground floor matching the street pavement level on this sloping site.
Photo by Dovetail Construction